Our Recent Projects.

Christmas Creek OPF1 Crusher Drainage Works

  • Removing unsuitable material
  • Installation of cementstabilised fill pavement
  • Installation of 180m of concrete barriers
  • Installation of 45m batter drain
  • Erosion repairs to 35m high batter

Abrolhos Culverts for FMG Cloudbreak in joint venture with Centrals Systems

  • Site setup, excavation & foundation preparation
  • Bedding preparation
  • Installation of single and multi-barrel culverts ranging from D900 – D2100
  • Mixing & placement of cement stabilised fill for back fill and headwalls
  • Apron and abutment
  • Stone pitching and haul road establishment
  • Conditioning of material, placement & compaction for the LV & train tunnels

FMG FY21 Surface Water CB & CC Culvert establishment in partnership with Ertech

  • Abrolhos and Cocos Culverts
  • Site setup
  • Excavation& Foundation preparation
  • Bedding preparation
  • Installation of single and multi-barrel culverts ranging from D900 – D2100
  • Mixing & placement of cement stabilised fill for back fill and headwalls
  • Apron and abutment
  • Stone pitching and haul road establishment

OPF Road Maintenance

  • Drainage works
  • LV Accessroad maintenance
  • Carpark establishment
  • Surface water run off management & windrow remediation

CC Landfill Excavation Project

  • Excavation of 22,000m3 of blasted rock

Road Repairs & Upgrades – Dewatering CB

  • Extensive road maintenance & road development through unsuitable low-lying wet areas to make all weather access for plant and machinery 30kms of road

Pipe corridor & Saline Bunds

  • Clearing, grubbing & topsoil stripping 10km piping corridor
  • Constructing 12 saline bunds
  • Excavating burials

Bigge Projects Establishment

  • Extensive clearing, grubbing & topsoil removal, 19km sheeted access road construction.
  • Offices, cribs & ablution facilities relocated and setup
  • TMP development
  • Relocation of standpipe and establishment of tank with suitable piping

Autonomous LV Road

  • Rip, condition, compact and grade existing autonomous LV road
  • Improve drainage, establish batter chutes & windrows
  • Construct 600m in CSF floodways

Codgers Liner Repairs

  • Repairs to dam wall and HDPE liner & piping
  • Removal of existing piping and liner & replacement
  • Settlement pond bank erosion repair

Christmas Creek Traffic Management

  • Removal and installation of 450+ traffic signs around processing facility.
  • Establish HV & LV parking areas.
  • Installation and extension of existing windrows around facility

Eliwana FY22 Surface Water Management

  • Excavation& Foundation preparation.
  • Bedding preparation.
  • Installation of single and multi-barrel culverts ranging from D900-D1800.
  • Mixing & placement of Cement stabilised fill for back fill and headwalls.
  • Apron and abutment.
  • Stone pitching and haul road establishment.

Transfer Pond Clearing works

  • Clearing, grubbing & topsoil removal, access road and project development over 17HA.

Norfolk Supervisor Office

  • General earthworks and delineation of work area.
  • Installation of new office facilities.
  • Form/Reo/Pour new concrete slab & footpath.