Christmas Creek OPF1 Crusher Drainage Works
- Removing unsuitable material
- Installation of cementstabilised fill pavement
- Installation of 180m of concrete barriers
- Installation of 45m batter drain
- Erosion repairs to 35m high batter
Abrolhos Culverts for FMG Cloudbreak in joint venture with Centrals Systems
- Site setup, excavation & foundation preparation
- Bedding preparation
- Installation of single and multi-barrel culverts ranging from D900 – D2100
- Mixing & placement of cement stabilised fill for back fill and headwalls
- Apron and abutment
- Stone pitching and haul road establishment
- Conditioning of material, placement & compaction for the LV & train tunnels
FMG FY21 Surface Water CB & CC Culvert establishment in partnership with Ertech
- Abrolhos and Cocos Culverts
- Site setup
- Excavation& Foundation preparation
- Bedding preparation
- Installation of single and multi-barrel culverts ranging from D900 – D2100
- Mixing & placement of cement stabilised fill for back fill and headwalls
- Apron and abutment
- Stone pitching and haul road establishment
OPF Road Maintenance
- Drainage works
- LV Accessroad maintenance
- Carpark establishment
- Surface water run off management & windrow remediation
CC Landfill Excavation Project
- Excavation of 22,000m3 of blasted rock
Road Repairs & Upgrades – Dewatering CB
- Extensive road maintenance & road development through unsuitable low-lying wet areas to make all weather access for plant and machinery 30kms of road
Pipe corridor & Saline Bunds
- Clearing, grubbing & topsoil stripping 10km piping corridor
- Constructing 12 saline bunds
- Excavating burials
Bigge Projects Establishment
- Extensive clearing, grubbing & topsoil removal, 19km sheeted access road construction.
- Offices, cribs & ablution facilities relocated and setup
- TMP development
- Relocation of standpipe and establishment of tank with suitable piping
Autonomous LV Road
- Rip, condition, compact and grade existing autonomous LV road
- Improve drainage, establish batter chutes & windrows
- Construct 600m in CSF floodways
Codgers Liner Repairs
- Repairs to dam wall and HDPE liner & piping
- Removal of existing piping and liner & replacement
- Settlement pond bank erosion repair
Christmas Creek Traffic Management
- Removal and installation of 450+ traffic signs around processing facility.
- Establish HV & LV parking areas.
- Installation and extension of existing windrows around facility
Eliwana FY22 Surface Water Management
- Excavation& Foundation preparation.
- Bedding preparation.
- Installation of single and multi-barrel culverts ranging from D900-D1800.
- Mixing & placement of Cement stabilised fill for back fill and headwalls.
- Apron and abutment.
- Stone pitching and haul road establishment.
Transfer Pond Clearing works
- Clearing, grubbing & topsoil removal, access road and project development over 17HA.
Norfolk Supervisor Office
- General earthworks and delineation of work area.
- Installation of new office facilities.
- Form/Reo/Pour new concrete slab & footpath.